Instruction clips

1. Cleaning and CCTV inspection

2. Changing the Flexirohr inserts
3. Adjusting the Flexirohr pipe cutter body
3.1 Adjusting the pipe cutter in the welding rig
4. Placing the Flexirohr to the welding rig
5. Cleaning and cutting the Flexirohr pipe ends
6. Start of the Flexirohr welding
7. After the cooling time
8. Attaching the Flexirohr pulling head
9. Assembling the upper pipe guide
10. Pulling the Flexirohr winch wire

11. Flexirohr wire guide assemling
12. Flexirohr pulling in phase
13. Flexirohr cutting and end sealing
14. CCTV after Flexirohr relining