Relining and reorganization of over 850 m steel pipe
In Jena / Germany one of our installation partners relined over 850 m of an old DN 150 steel pressure pipeline with the DN 125 Flexirohr pipe and converted into a gravity connection line. The renovation was done in 4 sections. The longest pull was over 230 m!
