Flexirohr training and installation in Portugal
Last week we had a training with a team from Pinto&Braz.
We installed a total of 12 manhole sections / 200m of DE270 Flexirohr inside DN300 concrete pipe in three days.
Thanks to the Pinto&Braz for a great performance!